The Fee Gap · 20-city study

One Storefront Sign, 20 Cities: Why a Posted Permit Fee May Not Be the Whole Permit Cost

For the same hypothetical storefront sign, the reviewed records in seven cities did not establish a complete permit amount. The 20-city study shows why a posted fee needs an explanation of what it covers.

In this study, “the fee gap” means the uncertainty that remains when a posted fee does not establish the complete government permit charges for the specified sign.

A number in a fee table may leave part of the question unanswered

A business planning a storefront sign needs to know which government charges apply to its project. One posted fee can describe only a minimum, one component, or a permit route that may not cover the proposed installation. In this study, “permit cost” means mandatory government charges for the initial authorization; private design, engineering and installation costs are outside the comparison.

Signage.com Research reviewed official records for one hypothetical sign across the 20 largest U.S. cities in the study's population frame. Seven cities had documented conditions in which the reviewed record did not establish one all-in amount. Four other cities produced a fixed scenario calculation, a dated published fee stack, a minimum or a no-permit outcome. Nine cities were excluded from substantive findings because the study record did not meet its evidence threshold.

How the 20 cities fit together: seven documented conditions + four other outcomes + nine exclusions = 20. Chicago and Charlotte belong to the seven conditions and also have qualified monetary observations; they are not additional cities.

Chicago illustrates the distinction. Its code and captured permit records support a $250 sign-plus-zoning standard, while an enacted footnote points to an additional factor-based permit calculation. The study preserves both parts of that record and does not treat $250 as a guaranteed all-in amount.

Philadelphia provides a different kind of answer: a $525.50 calculation for the specified project and filing assumptions. San Diego's $1,543.11 is a dated published stack with an additional-hourly-fee caveat. Keeping those labels beside the figures is essential to understanding what the study found.

Read each amount by the kind of answer it provides

The observations below are grouped by meaning. They do not form a fee ranking, national range or comparison ratio.

Calculations for a specified permit path

Fixed scenario calculation

Philadelphia

$525.50

$253 zoning + $253 building + $3 City surcharge + $4.50 State surcharge + $12 record retention.

The record-retention charge assumes three 24×36 building-plan sheets. The result describes that scenario and filing assumption.

Philadelphia: sources and qualifications

Dated published fee stack

San Diego

$1,543.11

$793.95 plan check + $737 General Plan Maintenance + $12.16 mapping.

Additional hourly fees may apply for work not covered by the schedule. This is a dated baseline, not a guaranteed final invoice.

San Diego: sources and qualifications

A minimum or an exemption

Scenario-specific exemption

Austin

No sign permit

The captured exemption applies to the specified project. It is not a $0 fee observation.

Austin: sources and qualifications

A published figure with an unresolved question

Published/observed standard

Chicago

The record supports $250: $50 for the sign plus $200 on-premises zoning. The enacted-footnote issue remains unresolved, so the figure is not an all-in guarantee.

Chicago: sources and qualifications

Schedule-applicability example

Charlotte

The FY2027 Residential schedule publishes a $240 Tier 3 Sign fee. The studied property is commercial. Schedule applicability, alternate-method or County routing, and additional fees remain unresolved. The row does not establish the permit cost for the studied storefront.

Charlotte: sources and qualifications

Seven conditions that left an all-in amount unsupported

These are dated findings about the records and scenario examined. They include different questions about components, applicable routes, minimums, source conflicts and operative rates.

New York City

Component and code-path question

The $165 records-management fee is one verified component. The separate sign-filing formula and the study-window code-path record do not support one all-in total. The study-window prior-code election remains part of the dated record; its enacted repeal takes effect July 17, 2027.

New York City: sources and qualifications

Los Angeles

Dated official-source conflict

The dated calculator capture and state/code materials produced a documented official-source conflict. The study preserves the dated observation and withholds both a defect allegation and a fixed total.

Los Angeles: sources and qualifications

Chicago

Standard plus a footnote question

The sign row publishes $50 per face and zoning publishes $200 for an on-premises sign; 2026 permit records repeatedly report $250, including a 32-sq-ft non-illuminated wall sign. Footnote c still points to an additional factor-based permit calculation.

Chicago: sources and qualifications

San José

Staff-time floors and an unproven stack

The retained official record contains Planning and Building sign charges, but Building amounts function as staff-time-or-table floors and the exact Planning-plus-Building stack remains unproven.

San José: sources and qualifications

Charlotte

Published row, unresolved applicability

The FY2027 Residential Zoning Fee Schedule publishes a $240 Tier 3 Sign row. Because the locked case is a commercial storefront and its anchorage remains outside the captured prescriptive standard, schedule applicability, alternate-method or County routing, and any additional fees remain unresolved.

Charlotte: sources and qualifications

San Francisco

Operative current rate unresolved

Current fixed lines were captured, but the operative Planning rate and other mandatory current components were not resolved from official records for the study window.

San Francisco: sources and qualifications

Nashville–Davidson balance

Project-specific review and rate vintage

Performance-based attachment review remains project-specific, and the legally required July 1 adjusted rate was not located in the reviewed official record.

Nashville–Davidson balance: sources and qualifications

One fully specified hypothetical sign

Using one specified project holds the size, weight, installation and filing assumptions constant across the records reviewed. The 32-square-foot panel makes the physical case concrete. It is not a survey of typical installations, and the study does not establish that these dimensions or anchors represent every storefront. Different specifications can change the permit path or charges.

An 8-foot-wide, 4-foot-tall sign mounted from 10 to 14 feet above grade The panel has an area of 32 square feet and a maximum weight of 40 pounds. Its bottom is 10 feet above grade and its top is 14 feet above grade. The elevation drawing uses one consistent scale. Attachment details are specified in the accompanying text. Grade · 0 ft 32 sq ft 40 lb maximum 8 ft wide 4 ft tall Bottom · 10 ft Top · 14 ft Non-electric · one face Flush to the existing wall
The face is 8 ft wide and 4 ft tall. Its bottom is 10 ft above grade and its top is 14 ft above grade. This schematic explains the hypothetical scenario; it is not an installation or engineering drawing.
Sign face
8 ft wide × 4 ft tall = 32 sq ft; one permanent, on-premises business-identification wall sign; one face; non-electric and non-illuminated.
Weight and assembly
Maximum 40 lb; a 2-inch-thick assembly with the frozen 2-inch trim geometry.
Mounting elevations
Bottom at 10 ft and top at 14 ft above grade; flush and parallel to the existing wall; entirely on private property.
Wall and attachment
Fully grouted concrete masonry unit (CMU) wall; eight 1/4-inch anchors with 1.5-inch embedment; no new structural framing.
Property assumptions
Existing lawful one-story commercial storefront; ordinary commercial zoning; no change of use, unrelated construction, special overlay or right-of-way projection.
Filing assumptions
$5,000 declared value where required; three 24×36 building-plan sheets; licensed contractor; ordinary on-time filing and surcharge-free payment.

Population frame: the frozen study uses the U.S. Census Bureau's Vintage 2025 incorporated-place ranking, with consolidated-city balances named where applicable. “Population rank” below identifies sample order, not a fee ranking.

Full scenario and transaction boundary

Included: mandatory government charges for the initial authorization, including applicable sign, zoning, building, application, plan-review and ordinary inspection charges, plus required permit-linked surcharges and assessments.

Excluded: electrical work, special overlays, variances, right-of-way use, new structural framing, unrelated construction, penalties, reinspection, expedited service, renewals, refundable deposits, optional payment charges, and professional, engineering, fabrication, installation or contractor costs.

The parameters above summarize the controlling frozen record and its dated corrections. The full methodology and scenario records the comparison assumptions and limitations.

How the review was conducted: Official public records were used to compile the first-pass findings. Later reviews were informed by the existing record; disagreements, amendments and corrections were logged. An additional review in a separate context identified the dimensional-label inconsistency corrected in this edition. This process was not blind independent replication. No city was contacted.

Commercial interest: Signage.com operates in the commercial signage market and has a commercial interest in the subject. That relationship did not change the study's evidence hierarchy, correction rules or publication exclusions.

All 20 cities, including exclusions

Nine excluded cities carry no quantitative or documented-condition finding. The full record below keeps those exclusions visible. Each city name links to its sources and recorded qualifications.

Read the complete 20-city record
Cities in the study’s population order
Population rank City Outcome Amount or result How to read it
1 New York City Documented condition No amount One $165 component is verified; a complete permit total is not established.
2 Los Angeles Documented condition No amount The dated official-source conflict is retained; no defect allegation or fixed total is made.
3 Chicago Documented condition with a qualified amount $250.00 $250 is a published/observed standard. The enacted footnote issue remains unresolved.
4 Houston Excluded from substantive findings No amount Excluded because the study record did not meet its evidence threshold; no city-level finding is made.
5 Phoenix Published minimum $293.00 Minimum only; additional review time may increase the charge.
6 Philadelphia Fixed scenario calculation $525.50 Fixed scenario calculation assuming three 24×36 plan sheets.
7 San Antonio Excluded from substantive findings No amount Excluded because the study record did not meet its evidence threshold; no city-level finding is made.
8 San Diego Dated published fee stack $1,543.11 Dated published fee stack; additional hourly fees may apply.
9 Dallas Excluded from substantive findings No amount Excluded because the study record did not meet its evidence threshold; no city-level finding is made.
10 Fort Worth Excluded from substantive findings No amount Excluded because the study record did not meet its evidence threshold; no city-level finding is made.
11 Jacksonville Excluded from substantive findings No amount Excluded because the study record did not meet its evidence threshold; no city-level finding is made.
12 Austin Scenario exemption No sign permit No sign permit for this scenario; this is not a $0 fee result.
13 San José Documented condition No amount Published Planning and Building charges do not establish one complete amount.
14 Charlotte Documented condition with a qualified amount $240.00 $240 is a published Residential-schedule row. Commercial applicability and other routing remain unresolved.
15 Columbus Excluded from substantive findings No amount Excluded because the study record did not meet its evidence threshold; no city-level finding is made.
16 Indianapolis balance Excluded from substantive findings No amount Excluded because the study record did not meet its evidence threshold; no city-level finding is made.
17 San Francisco Documented condition No amount No total is established for the study window.
18 Seattle Excluded from substantive findings No amount Excluded because the study record did not meet its evidence threshold; no city-level finding is made.
19 Denver Excluded from substantive findings No amount Excluded because the study record did not meet its evidence threshold; no city-level finding is made.
20 Nashville–Davidson balance Documented condition No amount No total is established for the study window.

Research files and source notes

Explore the city ledger, calculation components, official-source links and methodology.

Use the source-checking guide to trace a city finding to its calculation, source dates and assumptions.

Referencing this study

Signage.com Research. One Storefront Sign, 20 Cities: Why a Posted Permit Fee May Not Be the Whole Permit Cost. September 4, 2026 edition; research window: August 2026.

Keep each amount’s label, applicability and caveat beside it. These findings concern one specified hypothetical project. They do not establish a national fee estimate, a city fee ranking or what businesses actually paid.

Limits and corrections

The findings describe the specified hypothetical project and the sources examined during the study window. The seven conditions have different causes and should not be treated as seven identical municipal defects. Excluded records do not establish a city-level finding.

This study does not measure processing time, approval probability, enforcement, service quality, policy merit, installed project cost or the economic effect of municipal rules. Different project facts, approval routes and later municipal updates can change the result.

September 5, 2026 presentation update: the opening summary was clarified and city-source links, citation guidance and navigation were expanded. The study’s scenario, amounts, city classifications and qualifications are unchanged.

September 5, 2026 clarification: a definition of “the fee gap” was added. The study’s scenario, amounts, city classifications and qualifications are unchanged.

September 4, 2026 correction: the workbook's width and height labels were corrected to 8 ft wide × 4 ft tall, consistent with the 10-to-14-ft mounting band. The 32-sq-ft area, 40-lb limit, reported amounts and city classifications are unchanged.

If a source, amount, arithmetic step or classification changes, Signage.com Research will update the affected ledger, page, downloads and dated correction record together.

Questions about a source, calculation or correction can be directed to:

Research contact: Michael Santiago · Signage.com Research · info@signage.com